DEMOLISH
Keywords: DEMOLISH
=== USER MANUAL ===
Usage: demolish
demolish yes / no
Description:
Tear down the base structure anchored in the current room.
Demolish prints a warning summary of what will be destroyed and
waits up to 30 seconds for demolish yes to confirm.
Warning Summary:
- Components Number of structure objects that will be
removed.
- Links Any synergy links touching this structure
are dropped.
- Spawned mobs NPCs the structure had summoned are
killed.
Default Base Rule:
A default structure cannot be demolished while you still own
any non-default structures -- they depend on the default as an
anchor. Demolish everything else first.
Restrictions:
- Must be in the same room as the structure's anchor.
- You must own the structure.
- Confirmation expires if you move or wait too long.
Notes:
- Demolishing does not refund the build cost. Plan
placements carefully.
- If you only want to drop a link rather than the whole
structure, use unlink.
Related Helpfiles: BUILD, BASE, UNLINK
=== END MANUAL ===